Skip to content

CERPRO has been called Drevise since 6 October 2026

Use Cases

Quality.

Critical characteristics, datum structure and inspection methods derived from the part itself.

Drevise quality assurance: inspection plan
3×

Faster characteristic capture per part, from drawing to ballooned list

100%

Of critical characteristics captured with tolerance, datum and standard

< 5 min

From drawing upload to a structured FAI characteristic table

0

Characteristics re-typed into inspection forms for the next revision

What quality gets from Drevise.

Inspection scope, plans and evidence generated from the drawing instead of typed by hand.

FAI Creation.

Generate and structure first article inspection packages from technical requirements.

What it does
Extraction of characteristics, ballooning logic, forms and required documentation.
Why it matters
Create FAI packages faster by turning requirements into structured inspection evidence.
Proof on the page
FAI package preview, characteristic table, drawing linkage and export workflow.
First article inspection plan generated from the drawing

Inspection Planning & Execution.

Turn specifications into inspection plans, checkpoints and execution evidence.

What it does
Plan inspection steps, assign characteristics and capture execution status.
Why it matters
Build inspection plans that stay connected to drawings, specs and quality evidence.
Proof on the page
Inspection plan, execution checklist, measurement evidence and nonconformance signals.
Plan · methods and samplingAQL 1,0
Ø30 h6Air gauge · 100% in processEvery part
Ø6 H12 ×4CMM · first article + 1 in 20Sample
M20×1,5Thread gauge · go / no-goEvery part
Ra 0,8Roughness tester · 1 in 10Sample
Groove 2,5Caliper · visual against DIN 471Released
Release planPrint worksheet

Operator Self-Inspection.

Check parts directly at the machine against the requirements of the drawing.

What it does
Gives the operator the characteristics to check, the nominal values and the measuring method for every part.
Why it matters
Deviations are caught at the machine, before the next part is produced.
Proof on the page
Characteristic list with measured values, tolerance check and release per part.
Part 12 of 2401 deviation
Fit Ø16 h715.992 · limit gaugeOK
Diameter Ø3535.06 · micrometerOK
Groove 1.1 ±0.11.18 · profile projectorOut of tolerance
Length 2121.03 · caliperOK
ApproveNotify quality
Integrations

Drevise works with the systems you already run.

PLM, ERP and CAQ stay the systems of record. Drevise reads the part definition out of them and writes its results back where your teams work.

Contact

See the inspection effort a drawing really contains.

Send us one drawing from a current project. We will show the characteristics, the applicable standards and the inspection effort Drevise reads out of it.